
With all the main building work now finished, we were now waiting for the outside steplift and overhead tracking hoist in Harriet`s bedroom to be installed .
We initially had a phone call from the steplift company, to say that they could fit the lift within a week, but there had been some problems on the bespoke build of the lift system and this had to be postponed for another couple of weeks.
When the lift people finally arrived, it felt like such a relief as we knew that we would no longer need to carry Harriet from the car into house, especially if she was sleeping. Harriet was also starting to get very heavy and it was a real strain carrying her safely.





